πŸ”‘ Wholesaler, Agent, or Investor? Join the Nexus Network β†’ Residential Inspection Commercial Inspection Multi-Family Inspection Insurance Field Inspection BirdDog / Real Estate Investors Water Testing Radon Testing Mold Testing Asbestos Survey Sewer Scope Only Aerial Drone Only Thermal Imaging Repairs & Referrals Pricing The Report Gallery Blog About 🐾 Bird Dog Report Lookup Nexus Network Contact Book This Inspection β†’ Call 313-920-3312
Asbestos pre-demolition surveyMichigan Β· Required step for most demolitions

Before the first swing, know what's inside.

A demolition crew cannot knock down what an asbestos survey has not cleared. We inspect the whole structure, sample every suspect material, and deliver the written survey your permit, your contractor and your schedule depend on.

Order a demolition survey
Commercial building at dusk, the kind of structure surveyed before demolitionWhole structure Β· every suspect material
Survey before demolitionNot optional

What's in the file

We inspect

  • Roofing, flashing and roof cement
  • Siding, soffit and exterior panels
  • Floor tile, sheet flooring and mastic
  • Plaster, drywall systems and joint compound
  • Ceiling texture and acoustic tile
  • Pipe, duct, boiler and furnace insulation

You receive

  • Every sampled material, located and photographed
  • Lab results from an independent accredited lab
  • A clear list of what must be removed first
  • A written survey your contractor and permit office can use
  • Guidance on abatement and what comes next

Where it fits in the schedule

OrderBook the survey as early as the project is real.
Walk & sampleInspector surveys and collects samples on site.
Lab resultsSamples are analyzed and reported.
AbatementIf needed, licensed contractors remove regulated material.
DemolishThe project proceeds with the survey on file.

Heads up on timing. Rules vary by building type and size, and the state environmental agency (EGLE) sets notification requirements before certain demolitions. We tell you which apply to your project, so the paperwork does not become the thing that delays the crew. After removal, a separate clearance step confirms the area is ready.

Call 313-920-3312

Demolition survey questions

Is an asbestos survey required before demolition in Michigan?

For most buildings it is, and the survey has to be done by a qualified inspector before demolition starts. Rules differ by building type and size, and the state environmental agency, EGLE, has the final word. We tell you which rules apply to your project.

What does the survey cover?

Every part of the structure that is going to be taken down, including roofing, siding, floors, ceilings, insulation, pipe and duct wrap, and boiler or furnace components, sampled and reported by location.

How long before demolition should I order it?

As early as possible. Sampling, lab results and any required abatement all have to be finished before the demolition crew arrives, and a state notification period can apply.

What happens if asbestos is found?

The report lists exactly what and where it is. Regulated material is removed by a licensed abatement contractor before demolition, and the report is what that contractor bids from.